Table of Contents
Picture a truck on the scale at 7:40 a.m. The grader calls it #1 heavy melt, the yard pays on an estimated price, and the driver leaves with a check. Three weeks later the mill docks the load for contamination, and the yard has to work out which scale ticket that adjustment belongs to, what the supplier is now owed, and what the inventory is really worth.
That gap between the price paid at the scale and the price the material is finally worth is what provisional pricing, settlements, and regrades exist to manage. Loop ERP, a scrap ERP built natively inside Oracle NetSuite, handles all three in one system. Below is what Loop ERP does with each one, followed by plain definitions and where the workflow breaks when the scale and the books are separate systems.
How Loop ERP handles provisional pricing, settlements, and regrades
Loop ERP is a scrap ERP built natively inside Oracle NetSuite for scrap metal recycling and other materials-based industries. Scale tickets, provisional prices, settlements, regrades, inventory, and finance live in one system, so the yard and the general ledger work from the same records instead of syncing between two products.
Because operations and finance share one data model and one general ledger, every scale ticket posts to inventory and the NetSuite general ledger the moment it is weighed. The Flexible Pricing, Finance Settlements, and Regrading module pages show each workflow in detail.
What is provisional pricing in scrap?
Provisional pricing in scrap is an estimated price set at the scale that stays open until the material is graded, sold, or tied to an index price. The yard records or pays the estimate on the scale ticket, then settles the difference once the real value is known. Grade and price are rarely final at weigh-in, and a buyer can adjust what they pay after their own inspection. When the scale and the books are separate systems, someone has to carry every one of those corrections across by hand.
How provisional pricing works on a scrap scale ticket
Provisional pricing follows the material from the scale to the final payment. Most yards run some version of these five steps:
- Weigh and ticket. The truck crosses the scale, and the scale ticket records the supplier, material, and gross, tare, and net weight.
- Grade. A grader assigns a grade, usually by eye. Grade names follow a shared language, most often the ReMA Scrap Specifications Circular, which sets out guidelines for buying and selling processed scrap commodities.
- Set the provisional price. The yard applies a contract price, a posted yard price, or an estimate.
- Sort, process, and sell. The material is sorted, processed, and shipped. The buyer's weight, grade call, or deductions come back, or an index price resolves after shipment.
- Settle. The yard compares the provisional value to the final value and adjusts what the supplier is owed. The difference is a credit, a debit, or a corrected bill.
Yards price this way because the facts that set the final value arrive late. Prices can move several times in a day, grade is rarely final until material is sorted, and the buyer at the other end of the sale can adjust what they pay based on their own inspection. Many scrap commodities settle on a price index after shipment, so the value on the original ticket is an estimate by design. A scrap ERP books the load from the day it arrives and settles it against the final numbers.
Settlements, regrades, and price adjustments in scrap
A scrap settlement goes back to a transaction and corrects what was paid or charged. It fixes the money on the ticket. A regrade fixes the material. It moves inventory from one grade to another and carries the cost along with it. The two often come from the same event, but they land in different places.
What triggers a settlement
Settlements start when new information arrives about a load that has already been ticketed. Common triggers are a grade correction after sorting, a weight dock for moisture or contamination, a buyer's inspection report, a change in the contract or index price, and a freight or fee chargeback.
The party that decides varies by contract. It can be the yard's own grader, the buyer's receiving inspector, or a formula in a purchase or sales agreement.
What triggers a regrade
A regrade happens when processing changes what the material is. Stripping insulated copper, pulling stainless out of a mixed load, and sorting a mixed lot into several grades all qualify. Each regrade is an inventory transaction: input grades go in, output grades come out, and the yield between them sets the new cost per pound. A regrade also covers the case where the first grade call was wrong and the material has already been paid for.
How a price adjustment reaches the supplier
Before the supplier is paid, a wrong grade is usually fixed on the ticket, and the payment reflects the correction. After payment, the supplier needs a credit, a debit, or a corrected bill, and inventory needs an adjustment to match. If the yard never runs the settlement, it keeps the overpayment on its books as inventory it does not actually hold at that value.
Where provisional pricing, settlements, and regrades break when the scale and the books are separate systems
Each of these events changes a number in two places: the yard system that holds the ticket and the accounting system that holds the ledger. When the two are separate products joined by an export or a sync, every change has to be carried across by a file, a script, or a person. That is where the breaks happen.
The common thread is timing. A provisional price is meant to be temporary, but a sync usually treats the first number as final and moves on. The correction arrives days or weeks later, after the period has closed, and finance spends the next close reconciling what the yard system says against what the ledger says.
The cost shows up as manual reversals and rework for scale operators and accountants, plus month-end close work that exists only to chase these differences.
What a connected scrap workflow looks like
The fix is to keep the ticket, the price, the settlement, and the regrade in one chain of records, so a change to one updates the others. That means a provisional price stays flagged as open until a settlement closes it, a regrade moves inventory and cost in the same transaction, and a price adjustment posts against the ticket it came from.
This is the idea behind a scrap ERP: scale tickets, settlements, regrades, inventory, and finance sit in one system instead of two systems passing files. When you evaluate any system, ask two things: can a settlement change a ticket without a reversal and re-entry, and does a regrade update cost in the same step as inventory?
If you run a scrap yard or a multi-site recycling operation, the Scrap and Waste Materials page shows how the platform handles tickets from intake through settlement. The Regrading and Finance Settlements module pages cover the two workflows in this post in more detail.
Book a demo to see how a scale ticket flows from the scale to inventory and the general ledger.
Frequently asked questions about provisional pricing in scrap
What is provisional pricing in scrap?
Provisional pricing is an estimated price recorded at the scale that stays open until the material is graded, sold, or tied to an index price. The final price is settled afterward, and the difference is paid or charged back.
What is a settlement in scrap recycling?
A settlement is a transaction that adjusts the price, weight, or both on a ticket after the fact. It finalizes what a supplier is paid or what a customer is charged once the real grade, weight, or price is known.
What is the difference between a settlement and a regrade?
A settlement corrects the money on a ticket. A regrade corrects the material in inventory by moving it from one grade to another and carrying the cost with it. A single event, such as a sort that finds higher-grade material, can require both.
Why do scrap yards use provisional prices instead of final prices at the scale?
The final value depends on facts that arrive after weigh-in: the sorted grade, the buyer's inspection, and in many cases an index price that resolves after shipment. A provisional price lets the yard pay or record the load now and correct it later.
What happens if a mill downgrades or docks a load after the yard has paid the supplier?
The yard needs to settle the difference with the supplier through a credit, a debit, or a corrected bill, and adjust inventory to match. If the yard skips the settlement, it has paid for material at a value it did not receive.
How does ERP software handle provisional pricing, settlements, and regrades?
A scrap ERP books a load at an estimated price when it arrives, then settles it against the final weights, assays, or index price. Each regrade is logged as its own transaction that moves quantity and value from one grade to another.








